back | metric units | view images | google map | download printable pdf | property search | disclaimer     
Alabama Site Details
Site Name: SouthPoint Industrial Park Site ID: 3860
Street Address: Northeast Corner of I-65 at I-565 Additional Address:
Nearest City: Huntsville Within City Limits: Yes Zip Code: 35739
County: Limestone MSA: Huntsville, AL
Latitude: 34.6331 Longitude: -86.8799
Located in Industrial Park: Yes Park Name: Southpoint Business Park Within Enterprise Zone: No
Within Favored Geographic Area: No Within Renewal Community: No
General Site Data
Total Acres: 174.0 Available Acres: 135.0 Additional Available: Largest Tract: 25.0 Smallest Tract: 13.0
Protective Covenants: Phase 1 Environmental: Preliminary
Geotechnical Report:
Topography: Slight Rolling
Preliminary
Wetlands Assessment:
Ecological (Endangered
Species) Review:
Cultural/Historical
Resource Review:
Zoning: Light Industrial
Previous Use: Agriculture Description: agriculture
Utilities
Natural Gas: Huntsville Utilities Existing Connection Size of Main: 6.0 in. Main PSI:
Water: Limestone Co. Water Authority Existing Connection Size of Main: 12.0 in.
Sewer: City of Huntsville Existing Connection Size of Main: 12.0 in.
Electricity Provider #1: Athens Utilities Existing Connection Service to Property (Distribution): Yes Transmission: No
Electricity Provider #2:
Telecommunications: AT&T Fiber Optic: Yes xDSL Available: Redundancy:
Transportation
Interstate Highway Miles to Access
I-565 0.0
I-65 0.0
Federal Highway Miles to Access Four-lane
20 0.0 Yes
31 3.0 Yes
Alabama Highway Miles to Access Four-lane
20 1.0 Yes
Rail Name: Norfolk Southern Track Status: Not Available
Rail #2: Track Status: Not Specified
Navigable Waterway: Tennessee River Dock Facility: Port 1 to 5 miles
Nearest Commercial Air City: Huntsville, AL Miles to Nearest Service: 5.0
Price
Sale Price: $72,000.00 per acre Land Lease Rate (annual): $72,000.00 per acre Negotiable: Yes Date quoted: 1/11/2010
Price Comments:
General Comments
  Comments: 9 lots are available. 3 sites are pad-ready and one new building is under construction.

Site information is current as of 1/11/2010